Luxture

Pro Tips to Ensure Perfect Application of Luxture Stone Finish

Pro Tips to Ensure Perfect Application of Luxture Stone Finish

A great product needs the right technique to bring out its true beauty. Luxture Stone Finish is designed for durability and elegance, but its performance depends on how well it’s applied.

Here are professional tips and best practices to guarantee flawless results every time.

Why It Works Anywhere

Adhesion Power: Bonds well on cement, gypsum, and wood.

Weather Resistance: Topcoat protection keeps exteriors safe from moisture and UV.

Crack Resistance: Flexibility prevents peeling or cracking.

Design Range: Over 100+ shades (SFA series) for interiors & exteriors.

🔹 1. Prepare the Surface Properly

  • Ensure the surface is completely dry and matured (new plaster should be cured for at least 30 days).
  • Remove dust, dirt, oil, and flaking paint.
  • For patch repairs, use Luxture Cemplast, followed by Luxture Decorseal primer.
  • Let the primer dry for 12 hours before applying the stone finish.

👉 Pro Tip: Never apply on damp or seepage-prone walls — moisture will reduce adhesion.

🔹 2. Mix the Packs Correctly

Luxture Stone Finish comes as a 3-pack system:

  • Pack A: Stone aggregates (natural/pigmented stones, quartz, ceramic, PU chips).
  • Pack B: Silicone-modified acrylic binder with fungicides.
  • Pack C: Protective top coat (TC-500 water-based / TC-1000 solvent-based).

Steps:

  1. Mix Pack A with Pack B.
  2. Add the right amount of clean drinking water.
  3. Stir until a uniform wet mix is formed.

👉 Pro Tip: Mix only as much material as you can apply within the working time to avoid waste.

🔹 3. Apply with a Spray Gun for Best Results

  • Use a spray gun to achieve uniform coverage.
  • Maintain an average 1.5–2 mm thickness.
  • Each bag covers around 100–110 sq. ft. depending on thickness.

👉 Pro Tip: Keep the spray gun at a consistent distance for an even texture across the wall.

🔹 4. Allow Proper Drying Time

  • Let the coated surface dry for at least 24 hours before applying the top coat.
  • Ensure good ventilation and avoid application if rain is expected within 48 hours.

👉 Pro Tip: Apply during dry weather between 10°C and 40°C for best curing conditions.

🔹 5. Protect with the Right Top Coat

  • Use TC-500 (Water-Based) for interiors or eco-friendly projects.
  • Use TC-1000 (Solvent-Based) for exteriors needing stronger protection against UV rays and rainfall.
  • Apply 2 coats for maximum durability.

👉 Pro Tip: The top coat not only enhances protection but also keeps colors vibrant for years.

🔹 6. Store & Handle Carefully

  • Keep products in a cool, well-ventilated area away from direct sunlight.
  • Always reseal containers tightly after use.

👉 Pro Tip: Handle with care — wear gloves and eye protection during mixing and spraying.

Final Word

A flawless wall isn’t just about choosing Luxture Stone Finish — it’s about applying it correctly. With proper surface preparation, mixing, application, drying, and topcoat protection, you’ll ensure walls stay durable, crack-resistant, and elegant for years.

👉 Follow these pro tips and let your walls showcase the true elegance of Luxture Stone Finish.

For More Information Contact Us

Leave a comment

All fields marked with an asterisk (*) are required